User Tools

Site Tools


spa

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
spa [2024/10/21 13:42] 103.6.151.222spa [2024/12/25 10:21] (current) – [Goal/ Objective/ Status] 103.252.202.197
Line 5: Line 5:
 ===== Goal/ Objective/ Status ===== ===== Goal/ Objective/ Status =====
  
-To bring down the amount of contributions SPs owe to June 2023 level (i.e. $26,429).+Three objectives: 
 +  * To reduce the amount of contributions SPs owe to June 2023 level (i.e. $26,429). 
 +  * To rationalise and streamline the payment process (per Koh Thong Joo's feedback at 39 AGM). 
 +  * To ensure Council Members are not in arrears at AGM
  
-Current SP Arrears: $55,843.65 (as at end-Aug 2024)+Current SP Arrears: 
 +  * $66,735.93 (as at end-Oct 2024) 
 +  * $44,763.42 (as at end-Sep 2024) 
 +  * $55,843.65 (as at end-Aug 2024) 
 +  * $76,480.38 (as at end-Jul 2024)
  
  
spa.1729518157.txt.gz · Last modified: by 103.6.151.222

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki